精品在线播放-黄色av网站在线观看-五十路六十路-不卡二区-亚洲性网站-色在线看-亚洲精品9999-国产精品久久久久毛片软件-国产福利二区-欧美一级色片-91麻豆精品在线观看-亚洲午夜一区二区-噜噜啪啪-欧美a级在线-亚洲人影院

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: light steel portal frame roof drainage
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.qdfuda.cn

Guangzhou Steel News: light steel portal frame roof drainage

Time:[2015-9-2]  Hits:5853

Guangzhou Steel News: light steel portal frame roof drainage


Light steel plant due to poor drainage and overflow gutter to the interior, the situation is affecting the normal use of occasional attacks, analyze the main reason is not rational design. On the concrete roof, within days of the ditch water rose to the roof, generally do not appear leakage problems, so "building water supply and drainage design specifications" (GB50015-2003) provision storm sewer design return period of only one year, standpipe drain endless rain, allowing innings gutter drain from the plant through the roof gable safety overflow.
The light steel plant roof and gutters are fabricated steel components, slab sealing function is far less than concrete roof, so in the design of roof drainage should not apply the traditional concept of the concrete roof drainage, such as the roof area per 200m to set up a root rainwater pipe. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號