精品在线播放-黄色av网站在线观看-五十路六十路-不卡二区-亚洲性网站-色在线看-亚洲精品9999-国产精品久久久久毛片软件-国产福利二区-欧美一级色片-91麻豆精品在线观看-亚洲午夜一区二区-噜噜啪啪-欧美a级在线-亚洲人影院

Language:CHINESESENGLISH

Home > News > Control purposes tall buildings?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.qdfuda.cn

Control purposes tall buildings?

Time:[2014-7-26]  Hits:5179

Control of high-rise building construction intentions?
Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum displacement and displacement to be controlled, the main intent of the following:
1, to ensure that the basic structure of the body in elastic stress state, to prevent cracks in the concrete wall studs, floor slab crack control number, width.
2, ensure the integrity of infill walls, walls, walls and other non-structural components, to prevent significant damage.
3, the regularity of the control plane configured to avoid the formation changes, adverse effects on the structure.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號